Process

How we work

Process

Eight steps from your drawings to install-ready delivery.

Every project runs the same eight steps, each with a committed timeline. You always know what happens next, what it costs, and what we need from you.

  1. 01

    Enquiry & 24-Hour Response

    Send drawings, a BOQ, a tender document or a reference photo — attachments up to 25 MB. A substantive first response comes back within 24 hours, with clarifying questions where the specification needs them.

  2. 02

    Quotation

    A line-item quotation within 5 working days, priced by item and quantity, with material alternates where the budget band asks for them.

  3. 03

    Design & Engineering

    CAD shop drawings and 3D renders within 2 weeks of order for most scopes. The approved drawing is the contract; nothing is machined before sign-off.

  4. 04

    Prototyping

    A control sample or full mockup in 2–3 weeks — finish, construction and hardware approved by hand before batch production begins.

  5. 05

    Batch Production

    Manufacturing runs 6–10 weeks for most programmes, with QC checkpoints at material intake, machining, finishing and assembly, and photo reports you can forward to your client.

  6. 06

    Pre-Delivery QC

    Every piece is fully assembled, measured and photographed before packing. Batch records tie each unit to the signed control sample — unit 200 matches unit 1.

  7. 07

    Numbered Packing & Export

    Modules are numbered to the installation manual — crate 3 contains exactly what step 3 needs. Export-grade wooden crates, ISPM-15 fumigation marks, container loading plans; sea transit is 4–6 weeks to most markets.

  8. 08

    Site Handover to Your Contractor

    We deliver install-ready, not installed. Your local contractor receives manuals and node drawings 2 weeks before arrival, with remote technical support during the site works.

Our scope ends at install-ready delivery: pre-assembled, inspected, numbered, crated — with install manuals, node drawings and remote support for your local contractor. We do not bundle installation, and that keeps your cost transparent.

Start at step one

An RFQ takes five minutes. A costed proposal comes back within 48 hours.